During the charrette at the LADC, students from the College of Architecture, Design, and Construction contributed hundreds of suggestions concerning their priorities for the renovation of the LADC, including the submission of floor plans for the rearrangement of the LADC, and votes for their carpet, furniture, wood stain, and fabric preferences.
In response, the library's renovation will emphasize differentiated spaces with designated collaborative and individual study areas, an updated color scheme, maximization of natural light, and new furniture and carpet.
The renovation will be completed during the 2012-2013 school year. Phase 1 (upstairs) begins this summer, and phase 2 (ground floor) will follow in December.